Dauntless Aviation
Airports North America United States California
KCIC
CIC
CIC

CHICO RGNL AIRPORT

CHICO, CA, USA

Airport Info
Suggest Updated Information for this Airport

Location

Latitude / Longitude: 39°47'43"N / 121°51'30"W
  39°47.7233'N / 121°51.505'W
  39.7954 / -121.8584
Elevation: 240.2 ft. (surveyed)
Variation: 16E (1990)
From city: 04 miles N of CHICO, CA

Operations

Facility use: Open to the public
Sectional chart: SAN FRANCISCO
Control tower: yes
Boundary ARTCC: OAKLAND
Responsible ARTCC: OAKLAND
FSS: RANCHO MURIETA [1-800-WX-BRIEF]
NOTAMs facility: CIC (NOTAM-D service available)
Segmented circle: yes
Lights: SEE RMK
Landing fee: no

Communications

UNICOM: 122.950
CTAF: 121.000

Nearby radio navigation aids

VOR radial/distance VOR name Freq Var
CIC at field CHICO VOR/DME 109.80 16E
RBL 136oT/25.2 RED BLUFF VORTAC 115.70 18E
MXW 30oT/33.3 MAXWELL VORTAC 110.00 18E
 
NDB name Hdg/Dist Freq Var ID
OROVILLE 329oT/21.1 212 16E OVE
PROBERTA 138oT/25.9 338 16E PBT
HALOW 343oT/39.3 222 16E MY

Services

Fuel available: 100LLA
Airframe service: MAJOR
Powerplant service: MAJOR
Bottled oxygen: HIGH

Runway Information

Runway 13L/31R

Dimensions: 6724 x 150 ft.
Surface: ASPHALT OR BITUMINOUS CONCRETE,GOOD CONDITION,SAW-CUT OR PLASTIC GROOVED
Edge lights: B/X/T
Latitude: IR G39-48-12.1 IR G39-47-16.1
Longitude: 1750N121-51-50. 1780N121-51-04.
Elevation: 8290W ft. 4520W ft.
Runway true heading: H 1 3
Declared distances: TORA:/2011 TODA:6724 ASDA:6724 LDA:6724 TORA:/2011 TODA:6724 ASDA:6724 LDA:6724
Markings: , in poor condition , in poor condition
Visual slope indicator: (.2 5 degrees glide path) (.2 5 degrees glide path)
RVR equipment: P4L V4L
Instrument approach: 3L147ILS/D 1R327
 

Runway 13R/31L

Dimensions: 3000 x 60 ft.
Surface: ASPHALT OR BITUMINOUS CONCRETE,FAIR CONDITION,NO SPECIAL SURFACE TREATMENT
Edge lights: C/Y/T
Latitude: SC F39-47-54.1 SC F39-47-29.2
Longitude: 1962N121-51-46. 2063N121-51-25.
Elevation: 5686W ft. 8867W ft.
Runway true heading: 1 3
Declared distances: TORA:/2011 TODA:3000 ASDA:3000 LDA:3000 TORA:/2011 TODA:3000 ASDA:3000 LDA:3000
Visual slope indicator: (.9 degrees glide path) (.0 degrees glide path)
Instrument approach: 3R147 1L327
 

Helipad H1

Dimensions: 64 x 64 ft.
Surface: PORTLAND CEMENT CONCRETE,GOOD CONDITION,NO SPECIAL SURFACE TREATMENT
Latitude: 39-47-48.0
Longitude: 0200N121-51-17.
Elevation: 4600W ft. ft.
Runway true heading: H
Visual slope indicator: (.0 degrees glide path)
Instrument approach: 1
 

Additional Remarks

  • FOR JET/HVY ACFT OPER EAST OF FLD TPA 1500 FT AGL; FOR LGT ACFT OPER WEST & EAST OF FLD TPA 1000 FT AGL.
  • BIRDS ON AND IN VCNTY OF ARPT.
  • FUEL AVBL 0730-1900. FOR AFTER HRS FUEL CALL 530-588-4888.

Instrument Procedures

Effective October 29, 2026 to November 26, 2026
    AIRPORT DIAGRAM (PDF)

IAPs (Instrument Approach Procedures)

    ILS OR LOC RWY 13L (PDF)
    RNAV (GPS) RWY 13L (PDF)
    RNAV (GPS) RWY 31R (PDF)
    TAKEOFF MINIMUMS (PDF)
    ALTERNATE MINIMUMS (PDF)

Departure Procedures

    CHICO FIVE (PDF)
 
    Legends & General Information
    Airport Diagram Legend
Topographic chart at:
Satellite photo at:
Airport diagram:

 Download PDF

Airport distance calculator
From:
Weather Reports

METAR

TAF

Safelog

 

Dauntless Aviation

© 2007-2026 Dauntless Aviation, all rights reserved
Information provided via PilotNav comes from a variety of official and unofficial data sources. As errors are possible, do not use PilotNav for primary flight planning purposes. Verify any information that you receive via PilotNav with current and canonical charts and other official documents. The material in this database is subject to database copyrights held by Dauntless Aviation and may not be copied without the express permission of Dauntless Aviation - licenses for use of part of all of this data are available for purchase; enquire via the Dauntless Aviation helpdesk. A number of mechanisms and markers exist in the database to protect against and identify infringement / copyright. Automated queries against this website are strictly prohibited, and all activity is logged and analyzed.