Dauntless Aviation
Airports North America United States Oregon
96OR

CABLE CREEK RANCH AIRPORT

UKIAH, OR, USA

Airport Info
Suggest Updated Information for this Airport

Location

Latitude / Longitude: 45°6'2"N / 118°49'0"W
  45°6.0333'N / 118°49.0167'W
  45.1006 / -118.8169
Elevation: 4060.0 ft. (estimated)
Variation: 17E (2000)
From city: 05 miles E of UKIAH, OR

Operations

Facility use: Private
Sectional chart: SEATTLE
Control tower: no
Boundary ARTCC: SEATTLE
Responsible ARTCC: SEATTLE
FSS: MC MINNVILLE [1-800-WX-BRIEF]
Segmented circle: no

Communications

Nearby radio navigation aids

VOR radial/distance VOR name Freq Var
PDT 172oT/36.3 PENDLETON VORTAC 114.70 20E
 
NDB name Hdg/Dist Freq Var ID
FORIS 186oT/35.9 230 20E PD
LA GRANDE 248oT/38.9 296 17E LGD

Services

Runway Information

Runway 12/30

Dimensions: 4800 x 90 ft.
Surface: ASPHALT OR BITUMINOUS CONCRETE,NO SPECIAL SURFACE TREATMENT
 
Runway 12
Runway 30
Traffic pattern: right
 

Additional Remarks

  • FOR CD CTC SEATTLE ARTCC AT 253-351-3694.

Instrument Procedures

No published instrument procedures available
Topographic chart at:
Satellite photo at:
Airport distance calculator
From:
Weather Reports

METAR

TAF

Safelog

 

Dauntless Aviation

© 2007-2024 Dauntless Aviation, all rights reserved
Information provided via PilotNav comes from a variety of official and unofficial data sources. As errors are possible, do not use PilotNav for primary flight planning purposes. Verify any information that you receive via PilotNav with current and canonical charts and other official documents. The material in this database is subject to database copyrights held by Dauntless Aviation and may not be copied without the express permission of Dauntless Aviation - licenses for use of part of all of this data are available for purchase; enquire via the Dauntless Aviation helpdesk. A number of mechanisms and markers exist in the database to protect against and identify infringement / copyright. Automated queries against this website are strictly prohibited, and all activity is logged and analyzed.